Internal tooling · Business operating system for a renovation company

BAMPE360 OPERATING SYSTEM

A five-person renovation company with no technical staff needed one system to sell, execute, bill and collect. Shipped in two days, then hardened for three weeks.

Role
Solo: product design, domain model, information architecture, design system, delivery direction and quality gating of AI-executed engineering
Timeline
2026 · 2 days to a complete V1, 3 weeks of hardening
Client
BAMPE360 · Full renovations, Barcelona. A team of 1 to 5 non-technical people
Scope
CRM, versioned quotes, job workspace, fiscal invoicing, no-code Studio, AI copilot, security and accessibility audit
  • 48h To ship all 10 planned phases, against a roadmap of 35 to 45 sessions
  • 0 Known cross-tenant or IDOR gaps after the adversarial security pass
  • 347 Automated tests behind a quality gate no change can skip

Sell, execute, bill, collect. One job, one history.

BAMPE360 runs full renovation projects. A lead comes in, becomes a quote, the quote becomes a job, the job gets invoiced under Spanish fiscal rules, and someone chases the payment. None of that is unusual. What's unusual is doing it with a team of one to five people who are not technical, split across two very different contexts: office staff who need dense, precise data on a desktop, and a site manager on a ladder with a phone, logging a photo and moving on.

Generic CRM-plus-invoicing tools solve the pieces. They don't solve the thing that actually matters at this size: every piece has to point at the same job, with one history nobody can quietly edit, and the fiscal numbering can never have a gap. That last one isn't a preference. It's the law.

  • Business problem: the company couldn't run its full cycle through one connected system with an audit trail
  • User problem: two very different people need the same data in completely different shapes
  • Product problem: the systems that would solve this are built for a scale and a technical sophistication this team doesn't have

What made it hard

  • Fiscal correctness isn't negotiable. Invoice series must be correlative with zero gaps under real regulatory scrutiny (VeriFactu, AEAT). A wrong architectural call here isn't a bug, it's a compliance failure
  • Two personas, one system. Desktop-first for the office and mobile-first for the crew isn't a responsive footnote. It changes which data is dense and which is summarised, and what counts as a good default
  • Non-technical users, real consequences. Every irreversible action (deleting a client, voiding an invoice) needed a confirmation a non-technical person actually understands, not a modal that repeats the button label
  • No legacy system and no user base to interview mid-flight. The spec had to be validated against the domain, Spanish tax law and construction workflows, before a single screen was safe to design
  • Everything had to stay configurable. Status flows, document templates, numbering formats, custom fields: all of it in the database and editable from the product, so a workflow change never waits for a developer

What I owned, and what I didn't

I owned the product end to end: problem framing, domain model, information architecture, the design system extracted from the company's existing brand, every screen's hierarchy, and the quality bar the work had to clear before shipping. The code was written by AI-assisted engineering (Claude Code) against that direction. Every architectural, product and design decision was mine, and I reviewed and gated the output against a quality framework I wrote before the project started: weighted across UX, UI, architecture, accessibility, performance and security, nothing shipped below 95 out of 100, with accessibility and security held to 100.

I'm stating that plainly because it's the real shape of the role. Knowing how to direct AI execution toward a well-architected, accessible, secure product instead of a fast demo is the skill on display here, not something to hide behind "we".

  • I owned: the domain model (what an Expediente is and why everything hangs off it), the design system, every screen's information hierarchy, the fiscal-numbering and AI-trust decisions, and the go or no-go call on every quality gate
  • AI executed under my direction: implementation, refactors, and the verification scripts that proved each gate passed
  • There was no human product or engineering team. That shapes the collaboration story into something more unusual than "worked well with engineering"

An invoice is born without a number. It only gets one when it's issued.

Why: Spanish fiscal rules require the invoice series to be correlative with zero gaps. If a number were assigned at creation, every cancelled draft would burn a number and break that correlativity.

Trade-off: drafts stay fully editable and cancellable, but the moment an invoice is issued it's locked. No voiding, only a formal rectifying invoice later. Less flexibility after issue, in exchange for a guarantee that can't be worked around by accident.

Result: the numbering sequence is atomic and gapless even under concurrent issuing. The one legitimate edge case, a genuine gap from a hard process failure, is logged as its own auditable event instead of silently disappearing.

The copilot only proposes. It never executes, and it never sees more than it has to.

Why: this is a small, non-technical team handling other people's money and personal data. An autonomous agent that's occasionally wrong is a liability. A copilot that's occasionally wrong and always reviewable is a feature.

Trade-off: every AI suggestion, a risk flag or a drafted follow-up email, needs a human click to become real. That's a slower, less magical copilot than what's technically possible.

Result: client emails, tax IDs and phone numbers never leave the server toward the AI provider. Only names and roles do. Every invocation lands in the same audit timeline as a human action, with cost and duration attached. The copilot can be wrong without the trust in the rest of the system being wrong.

One entities table with roles, not separate client, supplier and subcontractor tables

Why: in this business the same company is often a client on one job and a subcontractor on another. Separate tables mean duplicate records, or a schema change every time a new role shows up.

Trade-off: more validation logic lives in the application layer instead of being enforced by table structure. A real cost, accepted deliberately.

Result: one entity holds multiple roles without duplication, and it's what made "configuration over code" possible in the first place. Custom fields extend the model without a migration. A structural decision, not a data-modelling preference.

The home screen answers "what needs me today"

It isn't a dashboard of charts. It's a ranked answer, by urgency. An administrator sees overdue tasks and a critical incident before anything else, and the copy says what happened and where, not just that something did. Below it, the next step the business should take, and a progress checklist for a team that has never had a system like this.

The CRM upstream is deliberately thin. Its only job is getting an opportunity to a quote. Everything downstream lives in the object that actually matters.

One object at the centre: the Expediente

Everything points back to one job record. The CRM, the quote, the invoice, the incident, the photo from the site visit. The state machine in the middle isn't decorative: a transition that isn't valid for this job's template can't be triggered, from the UI or from the service layer underneath it.

The economics block shows billed, real margin, percentage executed and pending collection. The alert, "real margin below plan", surfaces the one number a renovation business actually loses sleep over.

The quote editor: versioned, sectioned, locked on acceptance

The most complex screen in the product, by intent. Line-level margin calculated live, sections to organise scope, full version history, and a hard lock the moment a version is accepted. You can see exactly what was promised to the client, permanently. Accepting a quote creates the job automatically, so the handover from sales to execution has no manual step to forget.

Studio: if it's business data, it doesn't live in the codebase

The company's fiscal identity, its own AI credential (validated, stored encrypted, never shown again), users, roles, workflow templates, document templates, numbering formats and automation rules all live here, editable without a deploy. The screen's own subtitle is the principle: configuration prevails over code.

The same workspace, thumb-reachable

The site-manager persona isn't a media query afterthought. The workspace that shows KPIs and a state machine on desktop collapses to a single column on a phone, with the job's state and alerts above the fold, because that's where it actually gets used.

What "done" actually took

The roadmap budgeted ten phases at two to six working sessions each. That estimate assumed the bottleneck was implementation time. With AI execution it wasn't: phases zero to nine shipped in two days and the company started running real jobs on it. So the plan changed. Instead of slow, cautious sequencing, front-load velocity into a complete V1, then spend a dedicated, separate pass finding what speed had skipped. That pass happened three weeks later. It wasn't polish, it was the plan.

A system built fast by one direction-giver has no natural second pair of eyes, and self-review reliably misses what an adversarial pass catches. So the audit ran as three independent lenses, accessibility and design, security, performance and quality, each grading the work as if it were someone else's. That's the collaboration pattern this project actually ran on: not consensus, but adversarial verification before anything gets called done.

Two findings changed how I think about fixes. The slowest screen, collections, already used the obvious optimisation; the problem wasn't how it fetched but how much. It loaded all six tabs' data on every request so the badges could show counts. Decoupling the cheap thing (a count) from the expensive thing (full rows) was the fix. And one shared table primitive was missing an accessible name, copied into 56 screens. That wasn't 56 problems. It was one problem duplicated 56 times, fixed once, in the primitive.

  • Found and closed before any external user: a live cross-tenant data leak in the activity timeline, several IDOR gaps where a guessed ID reached another tenant's object, an invoice-year bug computed in UTC instead of Madrid time, and a race condition in invoice numbering
  • A desynced migration history between dev and production, reconciled without a single destructive operation
  • Strict null-safety turned on for all production code, with 387 real fixes, each a guard rather than a silenced error
  • Five service files of 1,700 to 1,800 lines decomposed into focused modules, with an export diff that had to come back empty before it counted as done
  • A CI lint gate that had quietly been red, turned green. A broken gate ahead of your tests means the tests after it were never really running

Measured, qualitative, and what I won't claim

Measured: all ten planned phases shipped in two days against a roadmap of 35 to 45 sessions. 56 of 56 data tables meet WCAG accessible-name criteria, fixed at the primitive. Zero known cross-tenant or IDOR gaps after the security pass. 347 automated tests and a full gate (typecheck, strict typecheck, lint, design lint, build) required before any change ships.

Qualitative: the product is BAMPE360's real operating system for running jobs, in daily use, not a pilot. The founder didn't have to choose between "ship something usable now" and "build it right", because the two-phase approach delivered both without pretending they were the same phase.

What I won't claim: there's no baseline to measure against (no prior system, no A/B test, no adoption funnel) and no user-research artefact validating the two-persona split beyond direct knowledge of the team using it. That's a real gap, not a rounding error.

Fast and rigorous weren't in tension. They were two phases.

The instinct going in was that moving fast and building rigorously pulled against each other, and the fix was to stop treating them as one phase. A complete V1 in two days only stayed defensible because hardening was budgeted, adversarial, and had its own bar to clear.

The fiscal-numbering decision is the clearest proof this wasn't a vibes-based build. Get correlativity wrong and it isn't a bug ticket, it's a compliance failure. That's exactly the kind of constraint that forces you to understand the domain instead of pattern-matching to a generic invoicing flow.

Case Studies